NOAA/USGS Debris Flow Project

Station Fire Intensive Research Area

NOAA...NWS logo ...NSSL logo...USGS Logo
line decor
Useful Links:

Intensive Operational Period (IOP) Status:

Friday, September 10, 2010 9:08 AM CST

All debris flow 2009/2010 SMART-R operations have been completed.

-Jorgensen, David

 


Notes:

There is a cell phone in the SMART-R (405-397-5686) for use during operations. The last operational day for the CPOL radar will be Feb. 13th.

Site-Specific Details:

Photographs

Burn Area Maps:

Logistics: