MCS probabilities generated
with RUC2 grids
Plots for the
2005 SPC/NSSL summer program
See the Summer Program Plan for a description
of these parameters
Extended Abstract for the 21st AMS
Conference on Weather Analysis and Forecasting
The plots should be
available about 2 hours and 5 minutes after the nominal time of the RUC
forecast cycle. The parameters are
generated at the analysis time and for the 3, 6, 9, and 12 h forecasts. After you click on the times below, scroll down to see
the plots for each forecast cycle (Note:
The probability contours aren’t plotted if the
Probability of MCS
maintenance:
Probability of MCS speed
≥ 18 m s-1:
RUC forecast cycle: